Perfect Peel At The "11-Foot 8 + 8" Bridge

On May 11, a courier truck came cruising down Gregson St. to beat the light and ended up getting a perfect, clean roof removal from the canopener bridge. This was crash #167 since 2008.


Sponsored Content

Sponsored Content